Post1 1

 Why a pod that arrives in panels and goes together with eight screws beats a welded box — in installation cost, floor planning and the day you move floors.

The cost is not the pod. It is the installation.

Every project estimate has two lines: the product and the work around it. The work is where budgets die — crane access, lift dimensions, door widths, permits, specialist labour, and the day the facilities manager discovers the unit cannot leave the floor it was installed on.

Modularity is the answer to that whole category of risk. It is not a marketing adjective.

What “eight screws” actually means

The MAXipod Basic is assembled from panels: ceiling, floor, side walls, glass. The entire cabin is joined with eight screws to form one rigid unit. No specialist installer. No welding, no adhesive cure time, no wet trades.

Practically, that produces four things a facilities team cares about:

  1. It arrives through a normal door. Packed weight 403 kg, net 361 kg, but it travels as panels and a 60 kg door — not as a 2.2 m monolith that needs a crane.
  2. It can be installed out of hours. A task measured in hours, not weeks, means no disruption to the floor.
  3. It can be taken apart again. Repeated assembly and disassembly is a design requirement, not an afterthought.
  4. It can be serviced. A panel is replaceable. A welded box is not.

Small footprint is a planning decision, not a spec

At 1105 × 1048 mm externally, a pod occupies roughly 1.16 m² of floor. That number matters less than where those square metres go. Because it is self-contained, it can sit in dead circulation space, at the end of a bench run, beside a lift core — places that cannot host a built room. Internally it still gives 950 × 900 × 2000 mm: enough to stand, sit and take a video call without the camera cutting your head.

The same compactness is what makes relocation possible. When the floor plan changes — and it will — the pod moves with the team instead of becoming sunk cost.

Two engineering details that decide whether it works in your building

Floor loading. 361 kg spread over 1.16 m² is about 312 kg/m², but the load arrives through four integrated castors and leveling feet, which are adjustable from inside the cabin. On a raised access floor, ask your engineer about point loads under the castors before delivery, not after.

Power. AC floor access, fused and grounded. The unit needs one floor position, not a dedicated circuit room.

Designing for the configuration you have not bought yet

The same reasoning applies to growth. If a team needs one booth today and three next year, the panels are the same panels. If a project needs a multi-person or conference enclosure, the structural approach does not change — the frame and absorber system scales, and those configurations are engineered to order. We will say the same thing here as in every conversation: we have not yet delivered a reference conference unit, so we will not publish a specification for one we cannot stand behind.

What we will publish is the part we can measure: 30 dB, Class A, ISO 23351-1, two fans, 30 W of light, eight screws, one afternoon.

CTA: Request the technical catalogue and installation drawing.

No comment

Leave a Reply

Your email address will not be published. Required fields are marked *